The Vermont Agency of Transportation (VTrans) will be replacing Bridge 1 (Whitesville Bridge) along VT 131 in Cavendish. The existing two-span structure will be replaced with a single span, steel girder bridge. The bridge is being constructed with Accelerated Bridge Construction methods, which will expedite construction and reduce disturbance to the public. During construction the bridge will be closed to through traffic from June 23 to July 25, 2014. Construction will be complete on August 22, 2014.
A Public Information Meeting will be held on May 20 (Tuesday) at 6 pm in the Cavendish Town Office Meeting Room.
No comments:
Post a Comment